Rainwater Harvesting System Design in Knit Concern, Godnail, Narayanganj

Rainwater Harvesting System Design in Knit Concern, Godnail, Narayanganj

Published at Sunday 22 August 2021 by Afia Zahin Nita

Knit Concern Group withdrawal 70, 00,000 litres water per day for industrial production. The total catchment area of the factory is 2517 sq.m and annual rainfall in this area are 2000 mm. RAiN Forum proposed a design which included two reservoirs to collect and store the rainwater alongside the 4 existing reservoirs present in the factory. The consultancy services provided included design and cost analysis regarding rainwater harvesting in Knit concern group.

0 Comments

Be the first to share what you think

Please Login to comment